Top Bridges – 2pcs fabrication and assemble for pusher tugs. New navigation/communication equipment and interior outfit.
More Detail info@kronmarin.eeRead more
Ro-Ro cargo ship FINBO Cargo is equipped by frontal and stern ramps on deck 5 for transport loading/unloading in more short time. The time for loading/unloading operations will be twice time less, because еhe process takes place simultaneously at two levels.
More Detail info@kronmarin.eeRead more
Design solution. Workshop drawings preparation, equipment supply and fabrication of movable roof system for special workshop. Shipyard is going to use special workshop for cargo hold hatches maintenance, so movable roof system is necessary.
More Detail info@kronmarin.eeRead more